And Need A Kick Up The Arse To Do It
Have so much to do to get this all in order so I can enjoy the machines for once.
Yesterday, spent most of the day moving machines about to get another project that needs finishing where I can work on it, then decided to move all the Arcade Carpet tiles from the 2 places they were to one of the sheds now some machines gone from there
I've bought some Carpet cleaner as there filthy from years of being in arcade, when we have some nice sun again and the stuff turns up I will get on cleaning the ones I need for the arcade building, then I have the huge task of moving machines and parts about so I can get the tiles up now and get these much better ones down, will have to do maybe a quarter at a time. that will then free up more space they are talking up. Also then I can sell the others
Extension still needs Porcelain tiles putting down, there piled up which is space of cab. Side extension is 85% plaster boarded, before I finished it lots more machines came up so filled space before it was done, what stopped me was adding Mains socket above fireplace in lounge for my Technics Hi-Fi system which hangs on wall, as well as Audio to it as no CD, then thought if I change it to TV anytime I should have TV Aerial, Ethernet and was trying to think what else, idea was to drill hole at angle through to the side extension which is other side of lounge wall so don't have to chop lounge wall out, so till that's all done can't finish plaster board
So shelving in there not finished either, then that needs all plastering. Once thats done and floor tiles down I can get the row of uprights along the back wall
When I moved the Carpet Tiles from the wall yesterday, ones at the back must of been damp, it's all soaked into the plaster board I did, they have been there a few years, so thats now more work to do
This end is pretty much done. only small area other end to finish walls then it's just shelves to do
Trouble is having to much stuff to get some of the jobs done, but I really need to crack on and get all this done. Some things I can't do unless the weather is good too
Have so much to do to get this all in order so I can enjoy the machines for once.
Yesterday, spent most of the day moving machines about to get another project that needs finishing where I can work on it, then decided to move all the Arcade Carpet tiles from the 2 places they were to one of the sheds now some machines gone from there
I've bought some Carpet cleaner as there filthy from years of being in arcade, when we have some nice sun again and the stuff turns up I will get on cleaning the ones I need for the arcade building, then I have the huge task of moving machines and parts about so I can get the tiles up now and get these much better ones down, will have to do maybe a quarter at a time. that will then free up more space they are talking up. Also then I can sell the others
Extension still needs Porcelain tiles putting down, there piled up which is space of cab. Side extension is 85% plaster boarded, before I finished it lots more machines came up so filled space before it was done, what stopped me was adding Mains socket above fireplace in lounge for my Technics Hi-Fi system which hangs on wall, as well as Audio to it as no CD, then thought if I change it to TV anytime I should have TV Aerial, Ethernet and was trying to think what else, idea was to drill hole at angle through to the side extension which is other side of lounge wall so don't have to chop lounge wall out, so till that's all done can't finish plaster board
So shelving in there not finished either, then that needs all plastering. Once thats done and floor tiles down I can get the row of uprights along the back wall
When I moved the Carpet Tiles from the wall yesterday, ones at the back must of been damp, it's all soaked into the plaster board I did, they have been there a few years, so thats now more work to do
This end is pretty much done. only small area other end to finish walls then it's just shelves to do
Trouble is having to much stuff to get some of the jobs done, but I really need to crack on and get all this done. Some things I can't do unless the weather is good too